Explore a Selection of Our Projects

Level Crossings

Construction Management for Banedanmark

Validation of Design Standard

Pedestrian Level Crossings

Assisting Technical System Manager (TSA)

Signalling and Interlocking

Snoghøj Station

Commissioning, Stage 3

Snoghøj Station

Signalling Design, Track Renewal

Høje Taastrup Station

Cutover and Commissioning, Stage 1

Signalling Programme (ERTMS)

Technical Expert and QA

Roskilde – Lejre

Cable Replacement and Commissioning

Further assignments

Aarhus Central Station (Aarhus H) – Risk Assessment and Technical Advisory
Banedanmark · 2026 – ongoing

Risk assessment and derogation application for the movement of road-going vehicles close to the track during loading and unloading of project materials, prepared and routed through Banedanmark’s approval process inside a very short window so the works could proceed without delay.

Eastern Funen Track Renewal – As-Built Update of Signalling Drawings
Railtech Denmark ApS (for Sweco / Banedanmark) · March – Summer 2024

As-built update and verification of the signalling drawings following execution, returned as a complete, checked set to Banedanmark’s technical document archive — a statutory prerequisite for entry into service and future maintenance.

Click link below for list of other relevant Projects

Let us help you

Would you like a no-obligation quote?

Fill out the form below and we will get back to you as soon as possible. We look forward to hearing from you.

40 88 99 50 Send mail